Belt Pkwy. suffers heavy delays after stuck drawbridge

The usually congested Belt Parkway was made even worse this afternoon when the Mill Basin Drawbridge was stuck in the upright position. Crews were eventually able to repair the bridge at around 2 p.m.

News 12 Staff

Jul 27, 2012, 8:11 PM

Updated 4,648 days ago

Share:

The usually congested Belt Parkway was made even worse this afternoon when the Mill Basin Drawbridge was stuck in the upright position.
Crews were eventually able to repair the bridge at around 2 p.m.
While the road has been reopened, the stuck drawbridge has caused massive residual delays expected to last a while.
News 12 Traffic and Weather